Advertisement

Two 519-Tons Abnormal Loads squeezing through a Roundabout

Two 519-Tons Abnormal Loads squeezing through a Roundabout Transport of two 276-ton transformers on November 1, 2019 in Iserlohn, Germany. The two 519-ton and 80-meter-long vehicles had to overcome the first serious obstacles shortly after starting at the Iserlohn-Hennen station. At a snail's pace and with a lot of shunting, they squeezed through two roundabouts.

The destination of the 380 kilovolt transformers was the Garenfeld substation in Hagen, Germany.

▬ Suggested Videos ▬▬▬▬▬▬▬▬▬▬▬▬

👉 10 Awesome Ship Launches:
👉 Excavator on 600 feet Cooling Tower:

▬ More Videos ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

►Subscribe my Channel:

▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

►Facebook:
►Twitter: www.twitter.com/HD1080ide

Trafo,Transformator,transformer,Trafo-Transport,Schwertransport,schwertransport doku,schwertransport extrem,Tieflader,schwertransport 2019,Schwerlast,schwerlasttransport,Baumann,abnormal load,heavy load,large load,wide load,heavy lifting,Heavy Transport,Heavy Haulage,Trafobrücke,Seitenträgerbrücke,Tranformer Bridge,High Girder Bridge,slj900,bridge girder,Iserlohn,Hennen,Hagen,

Post a Comment

0 Comments