The camera train starts in the main yard, makes almost a full lap of the main level before descending into staging. After running around the reversing loop, we'll climb the grade and make a full lap in the other direction. Lastly we'll make a final lap, this time using the cut-off track back to the main yard. The only trackage not used during this run is the logging branch.
0 Comments